Concrete volume calculator

Concrete needed for a slab, with a waste allowance, in cubic metres and cubic yards.

m
m
cm
%
Enter your values and press Calculate. Your inputs stay in the address, so you can switch language or share the link.

Formula

volume = length × width × thickness with waste = volume × (1 + waste ÷ 100)

How it works

Volume is length × width × thickness. Add an allowance for spillage and uneven ground and order the larger figure.

Worked example

The same calculation with the default values:

  • Length 6 m
  • Width 4 m
  • Thickness 10 cm
  • Waste allowance 10 %
  1. thickness = 10 cm ÷ 100 = 0.1 m
  2. volume = 6 × 4 × 0.1 = 2.4 m³
  3. with waste = 2.4 × (1 + 10 ÷ 100) = 2.64 m³
  4. 2.64 m³ × 1.30795 = 3.45299 yd³

Result: Volume (no waste): 2.4 m³ · Volume to order: 2.64 m³ · Volume to order (cubic yards): 3.45298963 yd³

For structural work, confirm quantities with your supplier and a qualified engineer.

Common mistakes

  • Forgetting to add a waste/overage allowance - concrete is always ordered with a margin (typically 5-10%) for spillage, uneven subgrade, and formwork variance; ordering the exact calculated volume often leaves a shortfall.
  • Mixing up thickness units (entering centimeters where the field expects meters, or inches where it expects feet) - this error alone can throw the volume off by a factor of 100 or 12.
  • Treating the calculated volume as exactly what will be delivered - ready-mix trucks and suppliers typically round up to their minimum order sizes, which may differ from the raw calculated figure.